Company News
The flowmeters successfully verified for acceptance by Kunshan Waterworks Company

                The flowmeters successfully verified for acceptance 
                           by Kunshan Waterworks  Company

          In the construction project of the fourth waterworks of Kunshan last year,BeiFei won
 the bidding of the electromagnetic flowmeters successfully ( including 3 sets that diameter
 is 2000mm).In cooperation with all the company,the flowmeters verified for acceptance by
 the fourth waterworks of Kunshan successfully in May of this year.

 

 

Links